Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/2074
Full metadata record
DC FieldValueLanguage
dc.contributor.authorIdiake, John-
dc.contributor.authorShittu, Abullateef-
dc.contributor.authorAnunobi, Anthony-
dc.contributor.authorAkanmu, Williams-
dc.date.accessioned2021-06-08T09:23:24Z-
dc.date.available2021-06-08T09:23:24Z-
dc.date.issued2015-02-
dc.identifier.citation7. Idiake, J. E., Shittu, A. A., Anunobi, A. I. and Akanmu, W. P. (2015). A Comparative Analysis of Traditional and Design & Build Methods of Procurement in the Nigerian Construction Industry. International Journal of Construction Engineering and Management. Scientific & Academic Publishing Co., LTD, USA. February, 2015, Volume 4(1): 1-12. DOI: 10.5923/j.ijcem.20150401.01. http://journal.sapub.org/ijcem. p-ISSN: 2326-1080, e-ISSN: 2326-1102en_US
dc.identifier.issn2326-1080-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/2074-
dc.descriptionInternational Journalen_US
dc.description.abstractResearch has revealed that projects surveyed in Nigeria suffered delays in project performance as a result of defects in the contract documents. The emphasis on procurement methods is on optimizing all parameters involved in project delivery namely, time, cost and quality but sadly in Nigeria, procurement of projects within these constraints has continued to be a challenge to the design team, the contractors, and managers of investments. Data were collected from selected building contractors in Abuja on 50 public building projects with the use of questionnaires and secondary/archival data were collected and tabulated for easy analysis. The factors affecting the performance of procurement methods were also assessed under which the complexity of design, capital cost of project and adequacy of contractor resources were identified as the most important factors affecting the performance of traditional procurement method. For the design & build procurement method the most important factors identified were financial risk, alterations to design and involvement of non contractual parties. It was also discovered that project completion at estimated cost, project completion at estimated time are the most important criteria for selection of traditional procurement method while in the design & build method, project completion at estimated time, project completion at estimated cost, nature of project and quality assurance were the major selection criteria. In terms of project performance, design & build procurement method was discovered to perform better in terms of cost and time than the traditional method implying that projects under the design & build procurement method are usually completed within the estimated contract sum and duration and lower level of cost and time overruns are conceded. In view of these findings, major recommendations of the study are that qualified professionals should be employed in the various construction processes to reduce the risk of time and cost overruns in the execution of projects and that clients adopting Design & Build procurement method should ensure that a well detailed and exhaustive brief is given to the contractor before the commencement of the project.en_US
dc.language.isoenen_US
dc.publisherInternational Journal of Construction Engineering and Management. Scientific & Academic Publishing Co., LTD, USA.en_US
dc.relation.ispartofseriesVolume 4;Number 1-
dc.subjectconstruction industry, design & build, procurement method, selection criteria, traditionalen_US
dc.titleA Comparative Analysis of Traditional and Design & Build Methods of Procurement in the Nigerian Construction Industry.en_US
dc.typeArticleen_US
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
Shittu's Publication 7.pdf1.76 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.