Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/15967
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDiugwu, Ikechukwu-
dc.contributor.authorEtte, Erik H-
dc.contributor.authorBaba, Dorothy Ladi-
dc.contributor.authorMohammed, Musa-
dc.contributor.authorYakubu, Henry A-
dc.date.accessioned2022-12-24T03:47:33Z-
dc.date.available2022-12-24T03:47:33Z-
dc.date.issued2017-10-03-
dc.identifier.issn2180- 3242-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/15967-
dc.description.abstractVariations in the approved cost of projects are common and could be triggered by a fluctuation in interest rates and variation in project duration. The paper aimed to explain the effect of time overrun (TO) and inflation rate on project completion cost (PCO). Variations in costs and durations of projects were calculated for 250 government and private building projects executed between 2005 and 2015, while inflation rates for the last quarter of these years were used. A multiple regression analysis of cost overrun as the endogenous variable, with time overrun and inflation rates as the exogenous variable was conducted for private and government-funded projects. The result revealed that the cost overrun can be predicted by the equations; predicted private cost overrun = 669673.60 + 50182.35 (time overrun) + 106690.20 (inflation rate), and predicted government cost overrun = -9805996 – 148721.90 (time overrun) + 1266038 (inflation rate) respectively for private and government-funded projects. Also, while there is evidence of a significant relationship between the completion cost of projects and variations in time and inflation rate for both private and government-funded projects, the mean variations between time overrun and inflation rate viz a viz completion cost is not equal for private and government-funded projects.en_US
dc.publisherInternational Journal of Sustainable Construction Engineering & Technologyen_US
dc.relation.ispartofseriesVol.8;No.2-
dc.subjectCompletion cost, Inflation rate, Project duration, Project, Constructionen_US
dc.titleModelling the Effect of Time Overrun and Inflation Rate on Completion cost of Construction Projects in Nigeriaen_US
Appears in Collections:Project management Technology

Files in This Item:
File Description SizeFormat 
modelling journal .pdf502.94 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.