Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/14682
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShittu, Abdullateef Adewale-
dc.contributor.authorEvborokhai, Mercy-
dc.contributor.authorTsado, Abel John-
dc.date.accessioned2022-05-28T02:05:13Z-
dc.date.available2022-05-28T02:05:13Z-
dc.date.issued2021-01-
dc.identifier.citationShittu, A. A., Evborokhai, M. O. and Tsado, A. J, (2021). Impact of Communication Management on the Delivery of Construction Projects in Abuja, Nigeria. Nigerian Journal of Technological Research (NJTR). Federal University of Technology, Minna, Nigeria. 16(1): 15 – 26. Available online at: https://dx.doi.org/10.4314/njtr.v16i1.11en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/14682-
dc.descriptionInternational Journalen_US
dc.description.abstractStudies have attributed project failure to poor communication management. This research assessed the impact of communication management on the delivery of construction projects in Abuja, with a view to proposing strategies for improving communication management. The quantitative research method was adopted for the study. Data collection was done through questionnaire survey. Analysis of data was carried out using Mean Item Score (MIS) and Relation Importance Index (RII). Results of the study revealed that the most important causes of poor communication management on construction projects range from Poor feedback (RII = 0.89) to Lack of training (RII = 0.82). The influence of communication management on the cost (MIS = 3.80-4.55), time (MIS = 3.83-4.50) and quality (MIS = 3.53- 4.25) delivery of construction projects is significant. Based on these findings, it was concluded that the impact of communication management on the delivery of construction projects in Abuja is significant. It was recommended that project managers should avoid the major causes of poor communication management which range from “Ineffective communication channel used” to “Lack of training” in order to minimise potential dispute, misunderstanding and project failures as a result of poor management of communication on project sites.en_US
dc.description.sponsorshipPrivateen_US
dc.language.isoenen_US
dc.publisherNigerian Journal of Technological Research (NJTR). Federal University of Technology, Minna, Nigeriaen_US
dc.relation.ispartofseriesVolume 16;Number 1-
dc.subjectCommunication, Communication Management, Construction Projects, Cost, Quality, Time.en_US
dc.titleImpact of Communication Management on the Delivery of Construction Projects in Abuja, Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
Shittu's Publication 73.pdf783.22 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.