Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/12033
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMusa, Musa Adamu-
dc.contributor.authorAbanda, H.-
dc.contributor.authorOti, H.-
dc.date.accessioned2021-07-29T13:11:12Z-
dc.date.available2021-07-29T13:11:12Z-
dc.date.issued2015-10-
dc.identifier.citationMusa, M.A; Abanda, F.H; Oti, H. (2015), Assessment of BIM for managing scheduling risks in construction project management. Proceedings of the 32nd CIB W78 Conference 2015, 27th-29th October 2015, Eindhoven University of Technology, The Netherlands, pp. 559 – 568.en_US
dc.identifier.urihttps://itc.scix.net/pdfs/w78-2015-paper-058.pdf-
dc.identifier.urihttps://www.semanticscholar.org/paper/Assessment-of-BIM-for-Managing-Scheduling-Risks-in-Musa-Abanda/5125b5831cc11c71598ccc9aa11795b4e3996e59-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/12033-
dc.description.abstractPoor risk management is among major challenges facing the construction industry on issues of timely project completion. Although risk factors are numerous, the nature of construction projects being prone to changes during execution makes it difficult to adequately capture risk aspects related to scheduling and timely project completion. Traditional 2D computer-based tools do not adequately utilize digitised computable information, thus limited in capturing construction risk. Hence, the exploitation of emerging BIM to bridge this gap is now being noted in construction project management. This study investigates the application of BIM in managing scheduling risk of construction projects. Being the preliminary part of an ongoing research, the investigation is carried out through a desk-top study. We argue that in order to properly minimize the risk of schedule delay in projects; construction sequencing activities need to be adequately digitised and BIM offers the opportunity to integrate vital aspects of project management that considerably improve scheduling risk management.en_US
dc.language.isoenen_US
dc.subjectBIMen_US
dc.subjectConstructionen_US
dc.subjectRisken_US
dc.subjectSchedulingen_US
dc.subjectProject Managementen_US
dc.titleAssessment of BIM for Managing Scheduling Risks in Construction Project Management.en_US
dc.typeArticleen_US
Appears in Collections:Project management Technology

Files in This Item:
File Description SizeFormat 
Assessment of BIM for Managing Scheduling Risks in Construction Project Management.pdf173.58 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.