Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/11955
Full metadata record
DC FieldValueLanguage
dc.contributor.authorNdoke, Peter N.-
dc.contributor.authorKolo, Stephen Sunday-
dc.date.accessioned2021-07-28T08:21:31Z-
dc.date.available2021-07-28T08:21:31Z-
dc.date.issued2010-
dc.identifier.issn0189-9546-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/11955-
dc.description.abstracthe headways,· spacing distributions and gap acceptance were measured from two main intersections in Minna, Centrar Nigeria.The average critical gap and spacing for stadium junction are 2.39 seconas and 11.08m respectively, and that of Mustapha hospital junction are 2~28 seconds and 9.56m respectively. The gap size at the 1ntersections ranges between 1 and 57 seconds. Drivers accept gaps ranging from 2.89 to 3.72 seconds with an average of 3.2 seconas at Mustapha hospital junction and the average time of movement is 2.06 seconds. Similarly,· drivers accept gaps ranging from 3.60 seconds and · 4.5 seconds with an average of 4.05 seconds at Stadium Junction, and the average time of movement is 2.69 seconds. Comparing these values with the respective critical gaps from the Highway Capacity Manual shows that only values from stadium junction get close. This shows that the delays at the intersections are due mostly to driver impatience and intolerance which at times lead to accidents at the intersections. Hence, it can be concluded that traffic accidents at the intersections are due mostly to driver judgment rather than gap availability.en_US
dc.description.sponsorshipselfen_US
dc.language.isoen_USen_US
dc.publisherNigerian Journal of Technological Developmenten_US
dc.relation.ispartofseriesVol 7;No 1-
dc.subjectGap Acceptanceen_US
dc.subjectcritical gapen_US
dc.subjectdriveren_US
dc.subjectbehaviouren_US
dc.subjectintersectionsen_US
dc.titleGap acceptance and driver behaviour at intersections in Minna, north central Nigeria.en_US
dc.typeArticleen_US
Appears in Collections:Civil Engineering

Files in This Item:
File Description SizeFormat 
Gap Acceptance at intersection in minna.pdf634.52 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.