Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/10446
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSaidu, Ibrahim-
dc.contributor.authorWinston, Shakantu-
dc.contributor.authorIdiake, John E.-
dc.contributor.authorAbdulkadir, U.-
dc.date.accessioned2021-07-18T16:17:06Z-
dc.date.available2021-07-18T16:17:06Z-
dc.date.issued2017-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/10446-
dc.language.isoenen_US
dc.publisherNIQS RECON 3en_US
dc.relation.ispartofseries;638-650-
dc.titlePROFESSIONAL'S PERCEPTION OF ON CONSTRUCTION MATERIAL WASTE AND COST OVERRUN AT THE DESIGN STAGE OF A PROJECT IN ABUJA, NIGERIAen_US
dc.typeArticleen_US
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
recon 3saidu.pdf817.41 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.