Analysis And Prediction Of Cost And Time Overrun Of Millennium Development Goals (MDGS) Construction Projects In Nigeria.

dc.contributor.authorEdoka Augustine Ijigah
dc.contributor.authorOGUNBODE Ezekiel Babatunde
dc.contributor.authorMoshood O. Ibrahim
dc.date.accessioned2025-04-29T06:32:15Z
dc.date.issued2012
dc.description.abstractAbstract The paper focuses on the analysis and forecast of cost and time overrun of MDGs construction projects in Nigeria. Twenty five MDGs construction projects from (2006-2009) were critically investigated and time and cost overrun of the project were studied. The Statistical Package for Social Scientists (SPSS) 19.0 version was used to analyse the variables using Paired t-test and simple regression at 95% confidence limits. The analysis was based on the adaptation of requisition method. The validity test on the efficiency of the model was highlighted using the confidence interval to enhance the application of the models. Mathematical models were developed. The findings shows that there is a significant different between the total contract sum, cost overrun, total contract duration, and time overrun for the MDGS projects. The study suggests acute need for government to engage in proactive strategic planning and approaches to keep construction project cost and time within reasonable limit for the actualization of MDGs policy of development and environmental sustainability.
dc.identifier.citationIjigah, E. A., Ogunbode, E. B. & Moshood, O. I. (2012). Analysis and Prediction of Cost and Time Overrun of Millennium Development Goals (MDGS) Construction Projects in Nigeria. Developing Country Studies, 2(10), 140-147.
dc.identifier.issn2225-0565
dc.identifier.urihttp://repository.futminna.edu.ng:4000/handle/123456789/1224
dc.language.isoen
dc.publisherDeveloping Country Studies
dc.subjectAnalysis and Prediction
dc.subjectCost Overrun
dc.subjectTime Overrun
dc.subjectMillennium Development Goals and Construction Projects.
dc.titleAnalysis And Prediction Of Cost And Time Overrun Of Millennium Development Goals (MDGS) Construction Projects In Nigeria.
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
Analysis And Prediction Of Cost And Time Overr.pdf
Size:
68.88 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: